Map of Planned Church Campus
Plans for the Worship Center and Preschool Children's Area
Our offices and youth center used to be the parsonage and garage area.
James is the jobsite foreman for Gerding Construction. He was taking a picture of the picture taker taking a picture of him taking a picture...
Two office modulars and a youth center.
Stan is rebuilding our handicap acess ramp for the modular.
The future site of our holding tank for fire suppression, it will be cemented in and filled with about 140,000 gallons of water.
Making the foundation slab of the fire suppression holding tank.
The ramp is almost up. Two more must be built and installed.
We now have to wear hard hats and be careful out there.
Scott and Nate laying pipe for a lot of power coming to the church.
Lee is goin' at it with Mike, Larry and Kyle.
She's got the latest in Tear Out Technology...
Rick got to take the first swing at tearing down the old office.
Jamey demolished part of the Church Office Building!
Its comin' down!
Guess how long it took!
16 Minutes was all it took!
our new worship center and preschool wing.
A couple of dry days let them pour the floor for the new building.
This is what it looks like before the cement floor is poured.
Check out the video on our church Facebook Page!
with the cement floor of the worship center and front door.
They poured this recently too.
You can see there is room for a window and a doorway.
It was done by 8:30am. (1/2 hour)
Basically Cement walls with Windows to be added.
It marks the area which will be the front door.
The second set of walls to mark off the Worship Center are now visible behind the cross structure.
This is a photo from the Road and what people see when they drive by...
Hold our new Diesel Emergency Pump for Fire Supression
For Emergency use to protect the building.
There is a strip all the way around the hall way of the new worship center.
You can Magnify this pic and the next one at the same time for comparison. Drag them side by side.
Note the attention to Detail the Gerding Construction guys have!
this was to place a new longer beam where the old outside wall used to be next to the carport.
Its in. then they put of the two new posts which will be concealed in the walls of the new prayer chapel and the new kitchen.
The completed outside.
Suburban Christian Church - The building